FabMachineSupplySheet metal machines, press brakes, shears, rolling, punching, and forming equipment for global industrial buyers.
Tube Welding Machine/ Spiral Welded Pipe Making Line
Bending And Forming

Tube Welding Machine/ Spiral Welded Pipe Making L | RFQ Sourcing Details

Bending And Forming · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryAssembly Fixtures
Unitset
diametersteel pipe with narrow strip steel. The
specificationsare expressed by outer
CategoryBending And Forming
CategoryBending And Forming
AvailabilityInquiry required
Updated2026-05-27

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Bending And Forming. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

No.

Model OD(mm) Plate width(mm) Thickness(mm) Coil weight(ton) Power(kw) Floor area(m) 1 LH-400 Φ219-Φ x180 2 LH-500 Φ219-Φ x180 3 LH-600 Φ219-Φ x180 4 LH-700 Φ219-Φ x180 5 LH-800 Φ219-Φ x180 6 LH-1000 Φ219-Φ x180 7 LH-1400 Φ325-Φ x180 8 LH-1600 Φ426-Φ x180 9 LH-1800 Φ508-Φ x180 10 LH-2400 508-Φ x180 11 LH-3000 Φ508-Φ x180 The s piral weld ed pipe equipment is to roll the low carbon structural steel or low alloy structural steel strip into a tube blank according to a certain helix Angle (called forming Angle), and then the pipe seam welded .

It can produce large diameter steel pipe with narrow strip steel. The specifications are expressed by outer diameter * wall thickness. The welded pipe should meet the requirements of hydraulic test, tensile strength and cold bending performance of the weld .

Test sequence of helical welded pipe unit LH-400 1, motor and hydraulic motor idling test, check whether the spin direction is correct. 2. The single test run time is 2 hours. 3, reducer gear transmission smooth, sound normal, good lubrication, no oil leakage phenomenon. 4.

The leveling roller and delivery roller rotate normally, and there shall be no channeling phenomenon. 5. The oil cylinder and pipe joint of the hydraulic system shall not leak oil during the test run. 6.

Process operation and instructions: 6.1 Process description of spiral welded pipe Unit LH-400: Winding up → unwinding → primer leveling → Manual vertical roller → shear butt welding → manual vertical roller → Delivery → Prebending guide plate → Forming → external welding → Output → cutting → pulling out 6.2 Operation Instructions: The strip coil is hoisted on the lifting frame of the winding trolley by the crane, and the hook is removed.

The trolley moves horizontally and sends the strip coil to the cone head of the uncoiler. The oil cylinder of the cone head of the uncoiler tightened the steel coil. The trolley lift is lowered back to its original position. After tightening the strip coil. Press the roller on the upper part of the strip steel coil, d

Tube | Applications and Buyer Notes

Tube is organized as a sourcing-ready Bending And Forming reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time question

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Bending And FormingBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.
diameter
steel pipe with narrow strip steel. TheBased on visible page data; confirm exact value in the RFQ.
specifications
are expressed by outerBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryAssembly Fixtures
Unitset
diametersteel pipe with narrow strip steel. The
specificationsare expressed by outer

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Continue from this detail page into sourcing structure

These links connect the detail page back to category hubs, procurement aggregates and knowledge pages so new inventory is not isolated.

FabMachineSupply related sourcing paths

Related categories FabMachineSupply related paths

Press Brakes and Bending

Rolling and Forming Machines

Shearing and Punching

Related applications FabMachineSupply related paths

Steel Fabrication Projects

Enclosure And Cabinet Production

FabMachineSupply procurement phrases

FabMachineSupply related product samples